Petition & Assessment ProceduresAlleysOwners of property abutting a proposed alley may petition the city of Duluth for that construction. The process is outlined in the Petition and Assessment Procedures flow chart (flow chart). Call: Cari Pedersen , P.E. 218/730-5091 Gas Main ExtensionsOwners of property abutting a natural gas main may request service from the City by contacting the Engineering Division at 218/730-5200.
Sanitary SewerOwners of property abutting a proposed sanitary sewer may petition the city of Duluth for that construction. The process is outlined in the Petition and Assessment Procedures flow chart (flow chart). Call: Mark Guisfredi, P.E. 218/730-5076 SidewalksOwners of property abutting a proposed sidewalk may petition the city of Duluth for that construction. For an estimate for your property, please call: Shane Anderson, Engineering Technician 218/730-5096 Storm Sewer ExtensionsOwners of property abutting a proposed storm sewer may petition the city of Duluth for that construction. The process is outlined in the Petition and Assessment Procedures flow chart (flow chart). Call: Gary Minck, P.E. 218/730-5074 StreetsOwners of property abutting a proposed street may petition the city of Duluth for that construction. The process is outlined in the Petition and Assessment Procedures flow chart (flow chart). The Policy on Street Extension for Limited Residential Development (as adopted by the Special Assessment Board on March 11, 2003) (document) will provide data on requirements for a variety of options. Call: Cari Pedersen, P.E. 218/730-5091 Water Main ExtensionsOwners of property abutting a proposed water main extension may petition the city of Duluth for that construction. The process is outlined in the Petition and Assessment Procedures flow chart (flow chart). Call: Larry Winner, P.E. 218/730-5073
|

